[1]
A. Arinda and G. Sarya, “ANALISIS WAKTU DAN BIAYA PADA PEMBANGUNAN SALURAN DRAINASE JALAN BETEK-SENGANTEN GONDANG BOJONEGORO MENGGUNAKAN METODE TIME COST TRADE OFF”, dts, vol. 8, no. 2, pp. 1–7, Jul. 2023.