HERTA NOVIANTO. (2016). ANALISA RISIKO RENCANA PEMBANGUNAN WADUK BANYU URIP UNTUK PENAMPUNGAN AIR DENGAN SISTEM HYBRID. Jurnal Teknik Sipil, 1(1), 16–22. https://doi.org/10.56071/de’teksi.v1i1.103