Arinda, A., & Sarya, G. (2023). ANALISIS WAKTU DAN BIAYA PADA PEMBANGUNAN SALURAN DRAINASE JALAN BETEK-SENGANTEN GONDANG BOJONEGORO MENGGUNAKAN METODE TIME COST TRADE OFF. Jurnal Teknik Sipil, 8(2), 1–7. https://doi.org/10.56071/deteksi.v8i2.574