[1]
Husnul Khotimah, I., Sholahuddin, M., Nevila Rodhi, N. and Tjandra, A. 2024. Analisis Pengendalian Waktu Proyek Menggunakan Metode Critical Path Method (CPM): Studi Kasus : Proyek Rehabilitasi Jalan Dander - Bubulan. Jurnal Teknik Sipil. 9, 2 (Jul. 2024), 60–69. DOI:https://doi.org/10.56071/deteksi.v9i2.951.