[1]
Arinda, A. and Sarya, G. 2023. ANALISIS WAKTU DAN BIAYA PADA PEMBANGUNAN SALURAN DRAINASE JALAN BETEK-SENGANTEN GONDANG BOJONEGORO MENGGUNAKAN METODE TIME COST TRADE OFF. Jurnal Teknik Sipil. 8, 2 (Jul. 2023), 1–7. DOI:https://doi.org/10.56071/deteksi.v8i2.574.