PENERAPAN METODE SIMPLEKS UNTUK OPTIMALISASI PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN DAN PENGANGKUTAN
DOI:
https://doi.org/10.56071/deteksi.v10i1.1035Abstract
Most construction projects currently use heavy equipment during their implementation. The purpose of using heavy equipment is to make it easier to do work so that work can be done more easily and quickly. The Babon River is a river that crosses the city of Semarang with a watershed area of ??119,417 km2 and a length of around 17 km starting from downstream of Pucang Gading Dam to the estuary passing Karang Roto Dam. The condition of the Babon River, which is experiencing channel narrowing and shallowing, has reduced the capacity of the river's cross-section to carry flood discharge, so that during the rainy season, floods often occur which inundate the area around the Babon River. Therefore, it is necessary to normalize the Babon River so that its function continues to run well so that it can overcome flooding in the area around the Babon River. Through the preparation of this journal the author tries to analyze the productivity of each heavy equipment used, namely: PC-200 Excavator, Hitachi ZX210LC-5g Long Arm Excavator + pontoon, Hino FG 260 JJ Dump Truck, Hino 136 HD Dump Truck, and Dump Truck Hino FM 260 JD. Based on the analysis results, the productivity results of the PC-200 Excavator were: 228.3 m3/hour, the productivity of the Hitachi ZX210LC-5g Long Arm Excavator + pontoon: 73.6 m3, the productivity of the Hino FG 260 JJ Dump Truck: 17.54 m3/hour, Hino 136 HD Dump Truck productivity: 11.76 m3/hour, Hino FM 260 JD Dump Truck productivity: 25.23 m3/hour.
Keywords: Heavy Equipment, Heavy Equipment Optimization, Heavy Equipment Productivity
References
Alimunawar, & Lubis, Fadrizal, & Winayati. (2018). Optimalisasi Penggunaan Alat Berat Pada Pekerjaan Galian Jalan Lintas Rel Kereta Api Rantau Prapat-Kota Pinang-Sumatera Utara. https://repository.unilak.ac.id/226/1/1771-Article%20Text-4622-1-10- 20190206.pdf
Alfandi, B. (2024). Pemindahan Tanah Mekanis. Jambi : Sonpedia Publishing Indonesia
Hadi, S. (2018). Alat Berat dan PTM. Banjarmasin : Deepublish
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2022). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 1 Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat. Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Lydianingtias, D. & Suhariyanto. (2018). Alat Berat. Malang : Polinema Press
Putra, I Kadek Y. A., & Suryawan, Kadek A., & Sukarmawati, Yuliana. (2022). Analisis
Kombinasi Alat Berat Excavator dan Dumptruck Pada Pekerjaan Tanah Pada Proyek Pusat Kebudayaan Bali. https://repository.pnb.ac.id/2576/6/RAMA_22302_1815124027_artikel.pdf
Rizma, Andhirta K., & Nursin, Afrizal, & Purnajuara, Pandit. (2021). Optimasi Waktu Kerja, Lokasi Disposal, dan Jumlah Peralatan PTM untuk Meningkatkan Kinerja Waktu dan Biaya. Media Komunikasi Dunia Ilmu Sipil.
Shinta, Annisa, & Harimurti, & Hasyim, M. Hamzah. (2017). Optimalisasi Penggunaan Alat Berat Pada Proyek Tol Pandaan-Malang. Jurnal Mahasiswa Jurusan Teknik Sipil.
Silaban, Merdy E., & Anggreni, Ida A. A. (2022). Optimasi Biaya Penggunaan Alat Berat Terhadap Pekerjaan Cut and Fill Dengan Metode Integer Linear Programming. Syntax Literate.
Yuwana, D. S. A. & Amin, M. (2022). Pengelolaan Alat Berat. Magelang : Pustaka Rumah Cinta
Hammerl, M., & Kromoser, B. (2021). The in fl uence of pretensioning on the load-bearing behaviour of concrete beams reinforced with carbon fi bre reinforced polymers. Composite Structures, 273(November 2020), 114265. https://doi.org/10.1016/j.compstruct.2021.114265
Jongvivatsakul, P., Thongchom, C., & Mathuros, A. (2022). Case Studies in Construction Materials Enhancing bonding behavior between carbon fiber-reinforced polymer plates and concrete using carbon nanotube reinforced epoxy composites. Case Studies in Construction Materials, 17(June), e01407. https://doi.org/10.1016/j.cscm.2022.e01407
Li, C., Viswanathan-chettiar, S., Sun, F., & Shi, Z. (2023). Effect of CFRP surface topography on the adhesion and strength of composite-composite and composite-metal joints. Composites Part A, 164(October 2022), 107275.De’Teksi : Jurnal Teknik Sipil e-ISSN: 2502-3152 https://doi.org/10.1016/j.compositesa.2022.107275
Samy, K., Attia, M., Fawzy, A., & Elsayed, T. (2022). Case Studies in Construction Materials Enhancing the Effectiveness of Strengthening RC columns with CFRP sheets. Case Studies in Construction Materials, 17(June), e01588. https://doi.org/10.1016/j.cscm.2022.e01588
Suprapto, E., Andryan, M., Purnama, C., & Santoso, T. B. (2023). Evaluasi Kinerja Perkuatan Gedung Menggunakan Carbon Fiber Reinforced Polymer (CRFP) Perfomance Evaluation Of Building Reinforcement Fiber Reinforced Polymer (CRFP). http://jurnal.unmuhjember.ac.id/index.php/HEXAGON/article/view/8758/4379